Brief Description: Reprimed lower switch panel and installed power c
Used lacquer thinner to remove paint and primer from the outside surfaces of the lower switch panel. Scuffed, cleaned and reprimed.
Drilled holes in the previously fabricated zee bracket which will hold the main power cable down near the bottom skin so that it clears the LH aileron cable. Drilled matching holes in the LH underfloor beam
Scuffed, cleaned and primed the bracket.
Riveted the bracket in place and bolted the Adel clamp (supporting the main power cable) in place .