KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  2-25-2017
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Finished flap actuator and started the rudder peda

Reconfigured the shop to move the aircraft tools toolbox next to the general tools toolbox and workbenches to cut down on the number of trips between boxes.

Finished the flap motor attachment bracket and bolted it to the fuselage. Drilled the holes in the flap motor actuator for safety wire, final drilled the bolt holes in the flap weldment and installed the flap actuator and weldment.

Began building up the rudder pedal assembly. Lots of drilling of the steel tubes. Had to run out to NAPA auto to buy a set of small hones to hone out inside diameter of some of the components to reduce binding.
' style=

Hole in flap actuator for safety wire

Hole in flap actuator for safety wire

' style=

Flap actuator installed

Flap actuator installed

' style=

The start of the rudder pedal assembly

The start of the rudder pedal assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.