KitLog pro

Powered By Kitlog Pro v2.0

N983LK
' style=
Date:  12-29-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Started landing gear installation

Started installation of the grove landing gear.

Flipped the fuselage over and leveled it out. Final drilled the 7/16" and 1/4" holes through the floor and gear tower weldments. Drilled the wear plates to add a 7/16"hole corresponding to the ones in the inboard gear brackets. Bolted the gear legs in place using the 7/16" bolt.
' style=

Leveled fuselage

Leveled fuselage

' style=

Drilling wear plates

Drilling wear plates

' style=

Grove gear in place

Grove gear in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.