KitLog pro

Powered By Kitlog Pro v2.0

JAKE'S WEB SITE
' style=
Date:  7-21-2016
Number of Hours:  8.00
Manual Reference:  
Brief Description:  CrossTie Channel updrilling

CrossTie Channel updrilling and fitting. Including the 4 Pulleys. I found out that a part must be fabricated for the Pulley assembly near the Mixer. I was surprised this part was not part of the angle upgrade.

Bob worked on studying the assembly of the Mixer.
' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.