Laid out and inserted center slat rib into Port-inboard slat skin. Cut slots in skin end ribs with mounting flanges. Critical dimension 1204mm flange to flange - will match slat mounting flanges in wing. Drilling for center rib requires 2 sets of hands to hold ben while drilling. Thanks Brett.