KitLog pro

Powered By Kitlog Pro v2.0

KURT'S WEB SITE
' style=
Date:  2-27-2015
Number of Hours:  4.00
Manual Reference:  7-F-7
Brief Description:  Prepared Firewall & components

Cold-snap. Wored in office on firewall components lay-out. Scribed firewall (7F7-1) reference lines. Scribed rivet lines on vertical liwer channel (7F7-2C), vertical top channel (7F7-3) left & right firewall stiffeners (7F7-5), and top channel stiffener (7F7-7SP). Scribed rivet locaions and bungee pin holes locations in left & right channel doublers (&f&-8C). Verivied pre-drilled left & right gear gussets (7F7-9C). Since I am replacing the elastic bungee supplied with the Viking steel bungee, laid out locations for 9mm mounting holes for the upper viking gear assembly on the upper channel (7F7-1SP). The upper channel supplied with my kit came pre-drilled for the spring/gear-tube assembly. Dis-assembled the viking spring assembly, primed, and oainted mounting legs and spring.
' style=

Firewall (powder coated) & components

Firewall (powder coated) & components

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.