Rigging of Cyclic Control and Collective. Stick fully aft must bring a pitch up of 16°, stick full down must bring a pitch down of 14° on water level indication. Stick full left must bring 9-10° bank, stick full right must bring 8-9° bank indication on water level. Collective: Adjust to have a 2mm distance from the bottom in the slot. (Collective in full down position)