Powered By Kitlog Pro v2.0
Radio Flyer Web Site
Legacy
flight testing
1-31-2009
< Previous Log Entry
Next Log Entry >
Date:
1-31-2009
Number of Hours:
6.00
Manual Reference:
Brief Description:
Initial Inspection
Lancair Legacy N2AA
Phase I Flight Test Report of Test Results
Initial Inspection
Non Standard Items
Airconditioning
Sequenced Gear doors
StarFlight Rudder pedals
Flap position Controls 0, 10, 40
Installed Aerodynamic Modifications
Wing Root Fairing
Tail Root Fairing
Counterweighted feathering MT prop
Anti Iced
Engine Installation
Air Intake from STC mod for C-210. Installation has been Modified to allow fitting for the Legacy installation.
Spring Attached to Throttle valve to pull assembly to an idle position
Static Port is installed on the Pitot Tube
Empty Weight: 1783
Gross weight: 2400
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Legacy Home
Category
# Logs
# Hours
All
812
3055
Avionics
104
302
Empennage
8
28
Engine
59
165
flight testing
31
31
Fuselage
543
1039
Instrument panel
46
150
Inventory
3
2
Miscellaneous
9
37
None
1
20
paint and interior
1
1275
Shop Supplies
1
1
Tools
1
2
Wings
5
3
Copyright © 2001-2024 Matronics. All Rights Reserved.