KitLog pro

Powered By Kitlog Pro v2.0

Radio Flyer Web Site
' style=
Date:  1-31-2008
Number of Hours:  2.30
Manual Reference:  ch3-18
Brief Description:  installed sequence gear up stops

installed sequence gear up stops per chapter 3-18. Installed micro switches on landing gear per Ronk-air page 27 and 28. Still need to wire switches. This is a modification so the inner landing gear doors will be closed when landing gear is down.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.