Brief Description: prepared and bonded 2 bids of carbon fiber
prepared and bonded 2 bids of carbon fiber to the new air-conditioning scoop and filled holes with flox. Prepared and bonded 6 bids of carbon fiber to the 1 inch hole on the outside of the fuselage.