Powered By Kitlog Pro v2.0
Kevins Web Site
RV-8
Empennage
11-1-2008
< Previous Log Entry
Next Log Entry >
Date:
11-1-2008
Number of Hours:
2.00
Manual Reference:
Ch. 6
Brief Description:
Vertical Stabilizer
Clecoed spar doubler to main spar. Back drilled hinges where needed and match drilled #30 all existing holes then clecoad all hinges in place.
Cleco doubler.
Match drilled hinges.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
303
Empennage
37
135
Fuselage
18
66
Miscellaneous
2
4
Wings
35
98
Copyright © 2001-2024 Matronics. All Rights Reserved.