Powered By Kitlog Pro v2.0
Kevins Web Site
RV-8
Empennage
9-20-2008
< Previous Log Entry
Next Log Entry >
Date:
9-20-2008
Number of Hours:
2.00
Manual Reference:
Ch. 6
Brief Description:
Right elevator. Counterweight/ Tip
Grinded down tip and fitted to elevator . Took as little lead off as possible on the weight enough for the tip to fit tightly. I will be fiberglassing over this at some time.
Time to buy a belt sander.
Tip, fitted to elevator
Enough lead I hope.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
303
Empennage
37
135
Fuselage
18
66
Miscellaneous
2
4
Wings
35
98
Copyright © 2001-2024 Matronics. All Rights Reserved.