KitLog pro

Powered By Kitlog Pro v2.0

Kevins Web Site
' style=
Date:  7-2-2012
Number of Hours:  3.00
Manual Reference:  Ch. 8
Brief Description:  Floor match drilling.

Install floor and baggage area and match drilled with a little help from Ron. Assembled and placed foot wells. Had to order a few drill bits for the next step.
' style=





' style=

match drilled

match drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.