Powered By Kitlog Pro v2.0
Kevins Web Site
RV-8
All
7-2-2012
< Previous Log Entry
Next Log Entry >
Date:
7-2-2012
Number of Hours:
3.00
Manual Reference:
Ch. 8
Brief Description:
Floor match drilling.
Install floor and baggage area and match drilled with a little help from Ron. Assembled and placed foot wells. Had to order a few drill bits for the next step.
match drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
303
Empennage
37
135
Fuselage
18
66
Miscellaneous
2
4
Wings
35
98
Copyright © 2001-2024 Matronics. All Rights Reserved.