KitLog pro

Powered By Kitlog Pro v2.0

KEN'S WEB SITE
' style=
Date:  7-31-2021
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Wheels mounted and gear put On

Wheels were mounted to klanding gear and temporaily put on to determine bolt length required for Atlee safety cables.
Cabane upper AN5 2.25 grip --2
Cabane lower AN6 1.5 grip drilled --2
Main gear attach upper AN6 2.25 grip drilled -4
Lower gear attach AN6 2" grip drilled- 2
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.