Enlarged GPS bracket opening for audio cable. Installed connectors on GPS audio cable and ran to appropriate terminals. Removed radio stack again and installed 3 more grounds on NAV pins 22, 49 and 60. Added another GND from avionics terminal block to firewall. Reinstalled radio stack and equipment. Disconnected CO detector audio lead due to audio degradation.