KitLog pro

Powered By Kitlog Pro v2.0

Karl Richcreek's RV8 Web Site
' style=
Date:  1-8-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wiring

Rivet defrost support brackets and installed temporary fan.
Wired GPS DB-9 connector.
Match drilled DB-9 connector plate to cross brace and deburred.
Installed all 3 DB-9 connectors to connector plate.
Shortened EMS and PC DB-9 connectors and riveted connector plate in place.
Ran powerline for defrost fan and ground wire for light controller.
Installed wiring and connectors for fuel and oil pressure.
Installed connector for oil temperature.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.