KitLog pro

Powered By Kitlog Pro v2.0

Karl Richcreek's RV8 Web Site
' style=
Date:  12-13-2013
Number of Hours:  4.40
Manual Reference:  
Brief Description:  Wiring

Installed NAV/COMM power and ground connectors.
Soldered wires to standby attitude DB-9 connector.
Power on test of standby attitude PFD good!!
Prepped instrument panel and screws for paint.
Painted instrument panel and screws.
Wired speed switch.
Ran power wire to lighting circuits.
Installed connectors and wired power, GPS and grond for standby attitude PFD.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.