KitLog pro

Powered By Kitlog Pro v2.0

Karl Richcreek's RV8 Web Site
' style=
Date:  5-21-2013
Number of Hours:  5.20
Manual Reference:  OP-11
Brief Description:  Wiring

Installed tie wraps on ELT brackets.
Added wire passthrough to right side of F-806 and 807 bulkheads.
Installed WDG-13 clamp to aft fuselage stringer for wiring conduit support.
Installed grounding wires for strobe ground and strobe box.
Wired landing and taxi lights to forward terminal block.
Ran aft block terminal ground wire.
Ran strobe and position light power supply lines.
Installed trim and flap controller wiring harnesses at aft avionics shelf.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.