Rivet L2-L0 ribs to forward spar. Installed all AN3-4A tank attach bolts. 25 in-lb torque. Installed all tank attach screws. Replaced AN509-8R8 screws with Stainless Steel NAS514P832-8P screws. Rivet top and bottom span of LE rivets to main spar. L LE complete.