Marked lower R aft cowling for fastener holes. Drilled holes and installed grommets. Installed fasteners and riveted receptacles. Layed out lower cowling L side flanges. Drilled mounting holes too high. Re-drilled holes at 3/16" from bottom of flange and back riveted open holes.