Sanded snorkel patch, cleaned and installed onto fuel servo. Everything clears!! Drilled, deburred, edge finished and fit front L air ramp CB-1002A. Marked bottom of L air ramp and 3/8" down on all sides of snorkel. Removed all, drilled L air ramp and cut opening. Cut the snorkel back 3/8" and sanded smooth.