Installed all rear and side baffles. Rivet L&R CB-701A and CB-711A front baffles to forward air ramp clips. Wired L&R electronicI ignition coils. Checked phasing. Checked electronic ignition phase power with battery master on and off. Spark on both setups. Excellent!! Tightened alternator belt. Installed both forward air ramps and front baffles. Torqued case bolts to 96 in-lbs.