Installed WDG3 cable clamp on L elevator horn for wire passthrough. Installed rudder. Ran wire to tail and strobe light, and covered with shielding mesh. Wired strobe and tail light connector. Ops checks good! Installed remainder of fuses except for the fuel pump. Attached rudder cables to rudder control horns.