Added nutplates to L&R mid longerons for the middle of the avionics shelf. Installed six K1000-06 nutplates on avionics shelf for strobe light power supply. Disassembled HS, VS, elevators and rudder. Deburred all bolt holes. Made cutouts for wood floor panels to install aft upper skin.