Powered By Kitlog Pro v2.0
Karl Richcreek's RV8 Web Site
RV-8
All
7-5-2008
< Previous Log Entry
Next Log Entry >
Date:
7-5-2008
Number of Hours:
0.60
Manual Reference:
6-9
Brief Description:
Preparing the left elevator
Match drilled L elevator E-703 end rib to E-704 counterbalance rib, and to E-702 spar.
Clecoed E-705-L root rib to E-702 spar.
Final drill to #40 E-705-L root rib to E-702 spar.
Clecoed E-701-L to understructure.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
818
2619
Avionics
46
159
Electrical
67
221
Empennage
73
202
Engine
73
220
Final Assembly
23
113
Finishing
127
341
Flying
2
Fuselage
216
719
Inspection
4
6
Interior
1
Miscellaneous
8
21
Prop
6
11
Tools
1
Wings
171
606
Copyright © 2001-2024 Matronics. All Rights Reserved.