KitLog pro

Powered By Kitlog Pro v2.0

JORGE'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-24-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Flaperons

Prepped the inboard nose ribs. Clecoed everything together and matched drilled the end holes. After deburring and priming, the left nose ribs were attached to the counterbalance pipe. Everything was clecoed back together and the hloes in the skin were match drilled into the pipe. Everything taken apart and cleaned up.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.