Prepped two more side skins and clecoed them on. Also clecoed on the rear bulkhead. Ran my strings for the elevator cables and the wires for the AST motor. I also made up the tubing for the static ports and pitot lines. These were zip tied to the frame. Last but not least, I inserted the static port rivets.