KitLog pro

Powered By Kitlog Pro v2.0

JORGE'S WEB SITE
' style=
Date:  2-18-2013
Number of Hours:  2.75
Manual Reference:  
Brief Description:  Skins, wires, bulkhead, tubes

Prepped two more side skins and clecoed them on. Also clecoed on the rear bulkhead. Ran my strings for the elevator cables and the wires for the AST motor. I also made up the tubing for the static ports and pitot lines. These were zip tied to the frame. Last but not least, I inserted the static port rivets.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.