Brief Description: Worked trying to adjust the elevator up limit
Trying to adjust the elevator up limit to what the plans call for. I am having to remove edges from the longerons at the very end of the fuselage to allow the nut and bolt head clearance. Also having to remove a lot of material from the top VS mounting angle to also allow clearance for the elevator horn attach bolt and nut. I think some Sonex re-engineering in this area is called for.