Unboxed center main wing spar and began setting out parts, ribs, attach brackets, etc for the center spar.I want to get a lot of the pieces fitted and ready for riveting or bolting before I insert the main spar into the fuselage. Easier for me to work on it when it's on saw horses rather than inserted into the fuselage. Center spar is much heavier than I expected.
Also remade and assembled the 2 front rudder cable pulley guide assemblies so the cable is 1/4" further inside the cabin and less apt to rub on the vertical angles. Several other builders have made this same modification.