Powered By Kitlog Pro v2.0
Joe's OneX #129 Project
OneX
All
7-1-2013
< Previous Log Entry
Next Log Entry >
Date:
7-1-2013
Number of Hours:
4.00
Manual Reference:
Brief Description:
Checked drawing for Rev changes
Checked drawing for Rev changes making sure all the required and optional revisions have been applied to the drawings.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
OneX Home
Category
# Logs
# Hours
All
192
645
Airframe
3
11
Avionics - Design
1
Electrical - Design
1
Empennage
22
86
Fuselage
89
304
Miscellaneous
9
25
Paint - Schemes
1
Panel - Layouts
2
RV9-A Project
1
Shop Supplies
2
1
Tools
3
2
Wings
58
216
Copyright © 2001-2024 Matronics. All Rights Reserved.