25-05 Step 5: Final drilled and tapped Roll Bar for Rear Window
32-11 Steps 3-5: Safety wired Sleeve to aft end of Rudder Cables & pulled cables out of Aft Bulkhead. Step 6: Temporarily attached a Rudder Cable Link to end of each Rudder Cable Step 7: Temporarily attached fwd end of Rudder Cables to Rudder Pedals Step 8: Built Rudder Cable Rigging Stop and put in place