Jeremy Balentines RV-8

|
Date: 4-3-2014
|
Number of Hours: 6.00
|
Manual Reference:
|
Brief Description: Riveting the left elevator
|

|
E-703, E-704, E-610PP, E-611PP, E-00001A and B, associated platenuts, E-709, E-702, WD-605-1-L, E-713, and E-701 were riveted together in the sequence called out for in the plans. The counterweight was inserted with the screws partially inserted. The elevator skeleton was then inserted in the right elevator skin. RTV was applied to the aft end of each elevator stiffener. The skin was then clecoed then riveted together except for the top flange where the trim tab hinge will be attached. All thats left to do on the left elevator is to form the leading edge and make the trim tab!
|

|
|

|

|

|
|

|

|