KitLog pro

Powered By Kitlog Pro v2.0

Jeremy Balentines RV-8
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-3-2014
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Riveting the left elevator

E-703, E-704, E-610PP, E-611PP, E-00001A and B, associated platenuts, E-709, E-702, WD-605-1-L, E-713, and E-701 were riveted together in the sequence called out for in the plans. The counterweight was inserted with the screws partially inserted. The elevator skeleton was then inserted in the right elevator skin. RTV was applied to the aft end of each elevator stiffener. The skin was then clecoed then riveted together except for the top flange where the trim tab hinge will be attached. All thats left to do on the left elevator is to form the leading edge and make the trim tab!
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2020 Matronics. All Rights Reserved.