Powered By Kitlog Pro v2.0
Jeremy Balentines RV-8
RV-8
All
8-15-2014
< Previous Log Entry
Next Log Entry >
Date:
8-15-2014
Number of Hours:
6.00
Manual Reference:
Brief Description:
Fabricating all the parts in the inboard fuel bay
Today I repeated everything for the right fuel bay. I also was able to match drill the flange for the drain valves for each tank as well as the gas cap flanges for both tanks.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
90
514
Empennage
28
158
Wings
62
356
Copyright © 2001-2020 Matronics. All Rights Reserved.