Powered By Kitlog Pro v2.0
Jeremy Balentines RV-8
RV-8
All
2-23-2014
< Previous Log Entry
Next Log Entry >
Date:
2-23-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Preparing the Horizontal Stab Ribs
The main ribs of the horizontal stab were prepped by prepping the edges and fluting the ribs. A notch on HS-00006 left and right was also made to fit around HS-814 and HS-810.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
90
514
Empennage
28
158
Wings
62
356
Copyright © 2001-2020 Matronics. All Rights Reserved.