KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  1-6-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Tanks almost done !

Today I proseal the top side of the left tank. I need to finish testing the flow level sensor and seal the rib cover missing on both picture below. As I mentionned, I have to wait for the inspector before closing the rear baffle off. Next weekend I will start the aileron and after that the flaps. Inspection should be schedule somewhere in late Feb or early March, 9 months later than planned. If all goes as I expect, I should start the fuselage sometime in the summer. We'll see !
' style=

Top left tank view

Top left tank view

' style=

Inside left tank, first bay

Inside left tank, first bay

' style=

Right tank in the craddle

Right tank in the craddle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.