KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  9-5-2021
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Panel work

Worked on completing assembling what people see ... the panel ! Took a while to put it all together. Small minor adjustments were needed but overall a good fit.

The intricate part were the addition of ribs to hold the Nav 2000 radio and the Garmin 175 GPS. There were interference with the panel ribs that required some inovative way to fit them together.

Looking forward to start doing the actual wiring and testing.

Missing on the last picture are the 3 push/pull cables: parking brakes, alternate air for the induction and cabin heat !

I looked at everything else that needs to find a place along with the wiring of it and there is not that much space available I find. That will be for next weekend.
' style=

Behind the panel .... ribs ineterferencing to each other

Behind the panel .... ribs ineterferencing to each other

' style=




' style=

Final look minas the 3 push pull cable

Final look minas the 3 push pull cable

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.