Jean RV6 Construction Log
' style=
Date:  2-28-2021
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Fitting cabin floor

Yesterday I did so many house errands that I only spent 3 hours on my project. But this morning, I started at 7:30 and stopped @ 16 hrs with only a 30 minutes for lunch ! This was a good day, yet, the progress is not super visible.

But although most holes are drilled, it is incomplete . Also the tunnel cover is not drilled and the nut plate prep drilling is not completed either.

I found that I spent a lot of time in the fitting mode. It took forever to drill one hole .... I have also installed a different baggage hold down ring on the left side at a different place that Van suggested.

But overall, it was a good day. I feel the progress although that visually, it can be deceiving. It seems that I always under estimate the time that a task will require.