KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  12-30-2020
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Riveting the canoe !

Long day that started at 6 AM after finding out late last night that the nut plates for the rudder cable fairing were interfereing with the tail skin. I first had to take the skins off and trim out the culprit and reassemble everything before 8 AM, which was the time Paul was expected.

He was right on time and except for a 30 minutes lunch we did not stop the whole day. It paid off as I estimate 1800 rivets were bucked. What still to be done is the 2 front side skins and fixing the floor skin .

Then it will be the time to flip that thing over ! Long day and exhausted but very satisfied !
' style=

Skins on for good !

Skins on for good !

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.