KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  9-20-2020
Number of Hours:  16.00
Manual Reference:  
Brief Description:  Deburring, priming

Not much to show this weekend, hence why there is only this entry for the pass 2 days. The weather was nice so I almost finished cleaning & priming the structure as you can see on the second picture.

I am also showing the crotch starp anchor that I installed. On the co-pilot side, it fitted perfectly but on the pilot side I had to cut and reinstall new flages because I had almost 1/8" gap.

The last picture is showing the assembly from above looking forward. You can see that I added an angle on the floor rib flange that must be cut off . I simply went a bit further to free the crotch rib.

By the way, from F604, my crotch belt is at 6 1/2" . There is no measurement given on the shrunk drawing and my readings on VAF seems that 6 1/2" works well.
' style=

Modified flange to fit

Modified flange to fit

' style=

weekend result

weekend result

' style=

Angle showing on the floor rib

Angle showing on the floor rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.