Did few little errands today: attached some main ribs (those under the fuel tank), started to install the flap brace of the left wing, and added the nut plates to the first bottom rib to permit later, to fasten the fuselage bottom skin with the wing intrados.
Adjusting the first 5" of the flap brace is not easy as the aluminium is 0,040" thick .... I will resume tomorrow but if it is sunny as forcast, I will work outside and probably go fly sometime as well !