Powered By Kitlog Pro v2.0
Jean RV6 Construction Log
RV6
All
1-20-2019
< Previous Log Entry
Next Log Entry >
Date:
1-20-2019
Number of Hours:
8.00
Manual Reference:
Brief Description:
Aileron preparation continuing
Not sure how I spent 8 hours on so little. But I still have to drill the angle to the skin on the other aileron. That will be for next weekend. I thought doing the aileron would be done by now but I must work slowly !
Jig to locate the angle on the skin
Angles drilled to the skin
Aileron skin cut out
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV6 Home
Category
# Logs
# Hours
All
375
2555
Cowling
24
221
Empennage
13
43
Engine
17
115
Fuselage
130
1087
Instruments
33
292
Other
2
18
Propeller
7
39
Wings
149
740
Copyright © 2001-2024 Matronics. All Rights Reserved.