Brief Description: Prepare Baffle stiffeners and Cyl 5 and 6 baffles
Remove hatched aeras from CB1004A stiffener. Prepare CB1002B, CB1008B, CB1004C and CB1010B. Prepare the left and right air dams, CB1002Cand CB1010C. Install the VA187 flanged duct and prepare CB1005A no6 cylinder baffle.