Powered By Kitlog Pro v2.0
John & Martha RV-9A
RV-9A
Fuselage
10-6-2007
< Previous Log Entry
Next Log Entry >
Date:
10-6-2007
Number of Hours:
6.00
Manual Reference:
Brief Description:
Baggage floor
I’m taking Matt’s advice and installing platenuts on the baggage floor so I can utilize the space under the floor for things like strobe power supplies, aux battery or what ever I can safely fit under the floor and between the ribs.
My friend Zach is helping
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
210
599
Canopy
29
128
Empennage
56
198
Firewall Foward
1
4
Fuselage
77
178
Miscellaneous
4
9
Tools
1
1
Wings
42
81
Copyright © 2001-2024 Matronics. All Rights Reserved.