Powered By Kitlog Pro v2.0
John & Martha RV-9A
RV-9A
Fuselage
9-16-2007
< Previous Log Entry
Next Log Entry >
Date:
9-16-2007
Number of Hours:
3.00
Manual Reference:
8-2
Brief Description:
F-705 bulkhead inspection
I removed all the floor panels in order to inspect the seatbelt attach points and to make sure all the bolts in the bulkheads were tighten to the correct torque values.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
210
599
Canopy
29
128
Empennage
56
198
Firewall Foward
1
4
Fuselage
77
178
Miscellaneous
4
9
Tools
1
1
Wings
42
81
Copyright © 2001-2024 Matronics. All Rights Reserved.