Finished deburring the rest of the holes. Reassembled with clecos.
Used laser level to check fuselage alignment. Re-confirmed workbench was level and then checked fuselage was level.
Started riveting. Began at the bottom of the front HT frame doing one line of rivets on the right side and then doing the corresponding line on the left side.