Triple checked wing skeleton was level. Marked rib spacing on aft channel and wing spar. Laid top skin inplace and aligned. Clamped and duct taped inplace. Drilled and clecoed aft edge of skin to rear channel. Rehecked alignment. Starting with RR#1 drilled holes and clecoed skin to ribs.