Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
Empennage
10-24-2019
< Previous Log Entry
Next Log Entry >
Date:
10-24-2019
Number of Hours:
1.50
Manual Reference:
8-5 step 3-5
Brief Description:
HS Front spar doubler and attachment brackets
Deburred all edges of doubler and front spar L and R attachment brackets.
After clamping a flat thick aluminum angle to the L&R attachment brackets, matchdrill with #30 drill 8 holes from spar into the attachment brackeds.
Final drill the other 1/8" holes in spar and doubler with #30 drill. CAREFUL ON THE MARKED DONT DRILL.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.