Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
Empennage
10-19-2019
< Previous Log Entry
Next Log Entry >
Date:
10-19-2019
Number of Hours:
5.00
Manual Reference:
8-2 step 1-4
Brief Description:
HS rear spar assembly & Prime
Deburring all parts including lightening holes
Matchdrill holes from spart into doubler #30 drill
Final drill all the other 1/8" holes with #30 drill
Machine countersink holes on spar. Mark holes NOT TO BE Drilled
Final drill #12 wht 3/16" holes in the hinge brackets.
Cleco hinge brackets and final drill#30 into spar.
Scuffed the hinge brackets. Cleaned all parts with EkoClean.
Primed with Valspar Self Etching ZincOxide Primer green
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.