KitLog pro

Powered By Kitlog Pro v2.0

RV10 I-CAVS
' style=
Date:  3-7-2020
Number of Hours:  4.00
Manual Reference:  10-13 step 3-8
Brief Description:  TAILCONE Aft deck drilling

After checking alignement and position of all parts we positioned the clamps to keep the aft deck in position we we started drilling F-1010A HS attachment angle and the top side of the longerons. Clecoing as we proceed.
Marchdrilling all the other pars (stop, doublers),
Matchdrilled the #12 holes in the longerons.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.