KitLog pro

Powered By Kitlog Pro v2.0

RV10 I-CAVS
' style=
Date:  2-29-2020
Number of Hours:  4.00
Manual Reference:  10-12 step 1-9
Brief Description:  TAILCONE position top skins and matchdrill

Position and cleco the top skins to the structure. Cleco as much as possible.
Insert stiffeners and position according to instruction.
Matchdrill all the holes into the bulkheads (EXECP F-1006) and the stiffeners F-1047A and F-1047L&R
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.